Package Included:
1 x Mainframe
1 x cord
1 x Sticker
1 x Probe film
1 x Manual
Specifications:
Product model: CM712
Operation: head: One
Working voltage: AC100-240v
: 20W
Working frequency: 50HZ
Product size: approx. 190*46*80 mm
Operation:
1. Before the operation, clean the face first, (if you have makeup, please remove the makeup with cleansing oil
and wash the face with again). And please fill the instrument with water.
2. After the supply is connected, the instrument automatically enters the standby state.
3. Level adjustment: After the is connected, the circular knob on the top of the handle is used to adjust
the level. The counter clockwise adjustment is 3 or 4.5 grades, and the clockwise adjustment is 3 or 1.5 grades.
4. Energy regulation: It is suggested that the first operation start from the lowest energy ( the lowest energy of instrument
is 1J, and the highest is 9J).
filling of the probe:
The in the probe is distilled water/mineral water. When the in the erected probe occupies half
of the space, it should be filled in the probe.
After the operation:
Please wipe the operation head with wet towel. Then clean the face with clean water or warm water. Immediately
apply a and remove it in ten minutes. If the moisture on the paper is dried halfway, it needs
timely replenishment.
Notice: If you need to operate on parts, consult first before the operation.
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a