HomePet SuppliesDogsCollars, Harnesses & LeashesLeashesTraining LeashesPVC dog leash long lead Waterproof dog leash long leash for dog super long dog lead 3m 5m 10m 15m 20m dog leash long for a dog
product_image_name-Generic-PVC dog leash long lead Waterproof dog leash long leash for dog super long dog lead 3m 5m 10m 15m 20m dog leash long for a dog-1

Share this product

Shipped from abroad

PVC dog leash long lead Waterproof dog leash long leash for dog super long dog lead 3m 5m 10m 15m 20m dog leash long for a dog

GH₵ 803.07
GH₵ 1,382.4042%

In stock

Order above GHC 150 on Jumia Express items & get free delivery | regular delivery from GH₵ 72.87 to Tema
0 out of 5
(No ratings available)
Variation available

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees GH₵ 72.87
Ready for pickup between 08 January and 13 January if you place your order within the next 43mins

Door Delivery

Delivery Fees GH₵ 84.77
Ready for delivery between 08 January and 13 January if you place your order within the next 43mins

Return Policy

Free return within 15 days for all eligible items.Details

Seller Information

ShenZhenShiGuBiSiDianZiShangWuYouXianGongSi

74%Seller Score

22 Followers

Follow

Seller Performance

Shipping speed: Average

Quality Score: Excellent

Customer Rating: Average

Product details

PVC dog leash long lead Waterproof dog leash long leash for dog super long dog lead 3m 5m 10m 15m 20m dog leash

Material:PVC MaterialColor:gray, black, red, pink, orange, yellow, blue, light green, greenSpecifications: M: Leash Width 1.6cm , length 3mL: Leash Width 1.6cm , length 5mXL: Leash Width 1.6cm , length 10mXXL: Leash Width 1.6cm , length 15mXXXL: Leash Width 1.6cm , length 20mFeature: 1, Waterproof PVC material, dirt-resistant, easy to clean; suitable for outdoor walking, traveling, mountaineering, etc.2, Low temperature resistance can reach minus degrees, don't worry about cold snow3. stainle steel, strong, durable, light in weight, flexible to rotate and effortle4. The rope feels comfortable and easy to tow; the dog will also feel comfortable5. 3m 5m 10m 15m 20m , five length specifications, whether it is short distance, medium distance, or ultra long distance, you can choose freelyDescription: Long Waterproof PVC material Easy to clean; dog leash for teddy ,chihuahua, poodle,Pomeranian, Bichon Frise,Pitbull Bulldog ,Labrador, German Shepherd , Husky Small Medium Large big Dog

imageimageimageimageimageimageimageimageimageimageimageimageimageimage

Specifications

Key Features

  • no:Is Smart Device
  • Basic Leashes:Dog Leash Type
  • No:is_customized
  • Quick Release:Feature
  • All seasons:Season
  • Plastic:Material
  • Solid:Pattern
  • Leashes:Type
  • LLhlideal:Brand Name
  • Mainland China:Origin
  • Guangdong:CN
  • Dogs:Type
  • PVC:Material:
  • gray, black, red, pink, orange, yellow, blue, light green, green:Color:
  • 3m 5m 10m 15m 20m:Specifications:
  • All Breeds:applicable dog breed:
  • Waterproof,dirt-resistant,easy to clean,pvc dog leash,long lead,long leash for dog,long dog lead,dog long leash,dog leash super long,3m dog leash,5m dog leash,15m dog leash,dog leash 3m,dog leash 5m,dog leash 10m,dog leash 15m,dog long leash,long dog leash,dog leash long,dog leash 20m,20m dog leash:Feature:
  • Low temperature resistance:advantage:

What’s in the box

1X PVC dog leash long lead Waterproof dog leash long leash for dog super long dog lead 3m 5m 10m 15m 20m dog leash long for a dog

Specifications

  • SKU: GE779LS3247XTNAFAMZ
  • Model: GBSgouqianyinsheng_10587
  • Production Country: China
  • Weight (kg): 0.2
  • Color: Pink
  • Main Material: PVC
  • Care Label: No direct sundlight, cleaning with low percentage alcohol
  • Shop Type: Jumia Mall

Verified Customer Feedback

This product has no ratings yet.

PVC dog leash long lead Waterproof dog leash long leash for dog super long dog lead 3m 5m 10m 15m 20m dog leash long for a dog

PVC dog leash long lead Waterproof dog leash long leash for dog super long dog lead 3m 5m 10m 15m 20m dog leash long for a dog

GH₵ 803.07
GH₵ 1,382.4042%
Questions about this product?

Recently Viewed

See All