Product parameters
Model
Input Voltage
Output
Output current
Output power max
Conversion
Dimension
Net Weight
GYVRM K241201
15-40V
12V (±0.25)
1A
12W MAX
>93%
56*24*20mm
50g
GYVRM K241202
2A
24W MAX
GYVRM K241203
3A
36W MAX
GYVRM K241205
5A
60W MAX
GYVRM JZS2401-10
1-10A
120W MAX
>93%
60*32*18mm
50g
GYVRM JZL241205-10
5-10A
120W MAX
>93%
64*57*22
120g
GYVRM JDL241210-30
10-30A
69W MAX
>93%
74*74*32mm
270g
GYVRM JD1L241230-40
6A
83W MAX
>93%
100*80*39
560g
GYVRM MXL241201-05
10A
110W MAX
>96%
56*32*18mm
50g
Installation dimension diagram
SKU
Shell size
shell material
Weight
Shell picture
non
63*27*14mm
small plastic shell
35g
GYVRM JZS241201-10
63*32*18mm
Medium plastic shell
50g
GYVRM JDS241201-15
75*40*32mm
Large Aluminum shell
100g
GYVRM JXL241201-05
58*24*20mm
small Aluminum shell
50g
GYVRM JZL241201-10
64*57*27mm
Medium Aluminum shell
120g
GYVRM JDL241210-30
74*74*32mm
Large Aluminum shell
270g
GYVRM JD1L241230-40
100*80*39
Enlarged Aluminum shell
560g
Applications
Wide range of applications: industrial automation control. Research
equment, LED lighting, industrial control equment, automotive equment,
power equment, instrumentation equment, equment,
refrigeration empty purifiers, electronic refrigerators, liquid crystal displays,
LED display, audiovisual products, safe ed computer chais, digital
products and various Instruments and other fields of various instruments.

User's Manual The 24V,36V(15-40V)battery voltage is converted to a 12V DC voltage. Precautions (Uncertain installations, please contact our company before installation) !!!Long-term use cannot be fully loaded, please reduce power or choose more powerful products, best 50% of maximum power. 1. Make sure that all the polarity is correct, and the anti-negative conversion converter (except for input tape reverse protection) 2. Make sure the cable is pure copper wire, the input and output cables cannot exceed 2 meters, and the output will be removed by more than 2 meters. The voltage will be reflected. If the line is extended, you need to increase the line diameter according to the corresponding multle. 3. The cable needs to be connected to the thread, please refer to the wire diameter size and securely connected. 4. The input terminal is required to connect the fuse or air switch, and you need to select the corresponding fuse or switch] (except the input belt fuse) 5. Make sure the battery capacity is large enough to provide sufficient energy. If the input energy is not enough, the voltage will be reduced. 6. Make sure the installation environment is well ventilated, so as not to protect over temperature protection, limit current output 7. Cannot connect directly to solar panels or wind wind turbines 8. Non-charged models cannot be charged battery and lithium batteries 9. When connecting the input test with DC power supply, the input should not exceed the voltage range of the battery, and no overvoltage protection (can be customized). Installation step (four lines or four / five terminals) 1. Turn off all power supplies and load switches 2. Before the wiring, pay attention to all positive and negative poles 3. Connection (OUTPUT-) to load negative, connection (OUTPUT +) to load positive 4. Connect the fuse or air switch to (Input +) input the positive cable, then connect (Input +) to the battery positive, connect (Input-) to the battery negative electrode 5. Make sure all positive and negative connections are correct (do not reverse, reverse the burnback converter), turn on the power and load switch (Note: If the ACC port is connected, connect the ACC to the ignition switch: If you do not need to use the ACC function, connect the ACC to the (Input +) battery "positive.) troubleshooting 1. Output no voltage, please check if all lines are connected firm, the battery is enough, whether the fuse is burning. 2. Output the voltage, check if the load start current is too large, the ventilation is good, whether the outer casing is heated, whether the cable and the thread are selected and installed, whether it is le than 2 meters, and the input battery has sufficient energy.
About shpingShping and Packaging All it will be double checked and well packed before sending.It will be dispatched within 2 business days after buyers pay for the order. It usually takes about 14 to 18 working days for delivering the package to the destination(for e areas,it may take a little longer).
Special Announcement:Please fill in the correct and detailed consignee, address and phone number in the order. For fast and correct delivery.If you do not receive order within 30 working days,please feel free to contact Customer Service before leaving Negative and Neutral Feedback, we will do our best to help you resoe the problem.TaxNo, you will only pay what is quoted as total cost at checkout, no more. You are not expected to pay any additional duties or taxes. If you are asked by Customs or our logistic partner to pay duties, please contact our Customer Service .
Your 100% satisfaction is very ant to usIf the product is not on good condition, You can return this product within 14 working days, please contact customer service center before returning.FeedbackYour satisfaction is our first priorityIf you receive the order and it is in good condition,we would be grateful if you would leave us 5 star Positive Feedback for the transaction.