HomePet SuppliesDogsCollars, Harnesses & LeashesLeashesBasic Leashes5M 10M 15M Dog Training Leashes Long Lead with Padded Foam Handle for Small Medium Large Heavy Duty Dogs Tracking Camping Agility Training More
product_image_name-Generic-5M 10M 15M Dog Training Leashes Long Lead with Padded Foam Handle for Small Medium Large Heavy Duty Dogs Tracking Camping Agility Training More-1

Share this product

Shipped from abroad

5M 10M 15M Dog Training Leashes Long Lead with Padded Foam Handle for Small Medium Large Heavy Duty Dogs Tracking Camping Agility Training More

GH₵ 1,093.63
GH₵ 1,530.7529%

In stock

Order above GHC 150 on Jumia Express items & get free delivery | regular delivery from GH₵ 93.21 to Tema
0 out of 5
(No ratings available)
Variation available

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees GH₵ 93.21
Ready for pickup between 27 December and 01 January if you place your order within the next 21hrs 27mins

Door Delivery

Delivery Fees GH₵ 105.11
Ready for delivery between 27 December and 01 January if you place your order within the next 21hrs 27mins

Return Policy

Free return within 15 days for all eligible items.Details

Seller Information

jienengpengyou

60%Seller Score

Be the first to follow

Follow

Seller Performance

This seller does not have enough history for us to evaluate his performance yet

Product details

【Quality Material Dog Training Leash】

The round climbing rope is woven from soft nylon material, it is tightly woven, not easy to pull, and has high strength, with special craftsmanship strong but lightweight, which means it's better than normal leashes and good for a long term use. 3/8” thick rope provides maximum durability and the check cord has a comfortable padded adjustable move double-layered handle, protecting your hand from rope burn.

【360° Swivel Hook Long Dog Leash】

Chew proof dog leash with 360-degree rotatable hook metal rust prevention hook, easy to hook on your dog's collar and will not break, can be moved with your dog and keeps the leash from getting tangled. Reinforced stitching design makes dog leashes safer and more durable.

【Perfect Length Rope Dog Leash】

The 50ft training dog leash is the perfect balance between freedom and control, the distance between human and dog can be adjusted at will, allowing your dog to explore while maintaining control. A long leash gives the dog more roaming area and freedom, making it a great choice for dog off-leash training, hiking, camping, walking. Make your pet more friendly and fun with other pets.

Waterproof Floatable Design Strong Dog Leash】

The non-absorbent material doesn't get heavier in the water, it doesn't sink, it floats when submerged, and it stands out against any background. Pets can swim without interfering with activity. so that you could play with your dogs at sea beach or pool.

【 Multi-Purpose Long Leash For Dog Training】

This durable, long, waterproof dog training leash is suitable for all breeds of dogs. Puppy, medium, large, heavy-duty dogs slip rope leash great for walking, hiking, swimming, camping, training, hunting, backyard, beach, recall training, and outdoor play. Can also be used as a clothesline, lashing rope, climbing rope, luggage belt, etc. Withstands 600 - 750 lbs of pull. Make your dog more comfortable, run freely.image


image


image


image


image


image


image


image


image


image


image


image


image


image


image

Specifications

Key Features

【Quality Material Dog Training Leash】

The round climbing rope is woven from soft nylon material, it is tightly woven, not easy to pull, and has high strength, with special craftsmanship strong but lightweight, which means it's better than normal leashes and good for a long term use. 3/8” thick rope provides maximum durability and the check cord has a comfortable padded adjustable move double-layered handle, protecting your hand from rope burn.

【360° Swivel Hook Long Dog Leash】

Chew proof dog leash with 360-degree rotatable hook metal rust prevention hook, easy to hook on your dog's collar and will not break, can be moved with your dog and keeps the leash from getting tangled. Reinforced stitching design makes dog leashes safer and more durable.

【Perfect Length Rope Dog Leash】

The 50ft training dog leash is the perfect balance between freedom and control, the distance between human and dog can be adjusted at will, allowing your dog to explore while maintaining control. A long leash gives the dog more roaming area and freedom, making it a great choice for dog off-leash training, hiking, camping, walking. Make your pet more friendly and fun with other pets.

Waterproof Floatable Design Strong Dog Leash】

The non-absorbent material doesn't get heavier in the water, it doesn't sink, it floats when submerged, and it stands out against any background. Pets can swim without interfering with activity. so that you could play with your dogs at sea beach or pool.

【 Multi-Purpose Long Leash For Dog Training】

This durable, long, waterproof dog training leash is suitable for all breeds of dogs. Puppy, medium, large, heavy-duty dogs slip rope leash great for walking, hiking, swimming, camping, training, hunting, backyard, beach, recall training, and outdoor play. Can also be used as a clothesline, lashing rope, climbing rope, luggage belt, etc. Withstands 600 - 750 lbs of pull. Make your dog more comfortable, run freely.

What’s in the box

1*package

Specifications

  • SKU: GE779LS4OPHHYNAFAMZ
  • Model: avoid chenicals
  • Production Country: China
  • Size (L x W x H cm): 12 x 13 x 14 cm
  • Weight (kg): 1
  • Color: Purple 15M

Verified Customer Feedback

This product has no ratings yet.

5M 10M 15M Dog Training Leashes Long Lead with Padded Foam Handle for Small Medium Large Heavy Duty Dogs Tracking Camping Agility Training More

5M 10M 15M Dog Training Leashes Long Lead with Padded Foam Handle for Small Medium Large Heavy Duty Dogs Tracking Camping Agility Training More

GH₵ 1,093.63
GH₵ 1,530.7529%
Questions about this product?

Recently Viewed

See All