HomePet SuppliesDogsCollars, Harnesses & LeashesLeashesTraining Leashes3M 5M Dog Leash Belt Longer Pet Leashes Walking Harness for Small Medium Large Dogs Ourdoor Training Long Lead Rope Correa Perro
product_image_name-Generic-3M 5M Dog Leash Belt Longer Pet Leashes Walking Harness for Small Medium Large Dogs Ourdoor Training Long Lead Rope Correa Perro-1

Share this product

Shipped from abroad

3M 5M Dog Leash Belt Longer Pet Leashes Walking Harness for Small Medium Large Dogs Ourdoor Training Long Lead Rope Correa Perro

GH₵ 247.17
GH₵ 422.4041%

In stock

Order above GHC 150 on Jumia Express items & get free delivery | regular delivery from GH₵ 33.96 to Tema
0 out of 5
(No ratings available)
Variation available

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees GH₵ 33.96
Ready for pickup between 08 January and 13 January if you place your order within the next 19mins

Door Delivery

Delivery Fees GH₵ 45.86
Ready for delivery between 08 January and 13 January if you place your order within the next 19mins

Return Policy

Free return within 15 days for all eligible items.Details

Seller Information

ShenZhenShiGuBiSiDianZiShangWuYouXianGongSi

74%Seller Score

22 Followers

Follow

Seller Performance

Shipping speed: Average

Quality Score: Excellent

Customer Rating: Average

Product details

Longer Pet Leashes Rope Outdoor Training Running Dog Leash Belt PP Dogs Lead for Chihuahua Small and Large Dog ProductFeatures:1. Material: This dog leash is made of nylon, which has good flexibility and tight coiled wire, rugged, wear-resistant, shock-resistant.2. Design: The dog leash has fine workmanship, simple and able design, a safer way to walk the dog.3. Multifunction: Using the pet leash, you can take the dog out for a walk at any time, which can better protect the dog's body from the development of injury and growth, can also be used with dog training.4.Multiple Options: Various colors and sizes, suitable for all types of dogs.Attention: As different computers display colors differently, the color of the actual item may vary slightly from the above images, thanks for your understanding.Color: Black/Green/Red/Pink/GreenMaterial: Nylon+AlloyNumber:BD0512Size: Length: S-1.5M/ M-3M/ L-5MPlease allow 0.5-1 inch error due to manual measurement.Package include: Dog Leash*1pc

imageimageimageimageimageimageimageimageimageimageimageimageimage

Specifications

Key Features

  • no:Is Smart Device
  • Basic Leashes:Dog Leash Type
  • No:is_customized
  • Polyester Blends:Material
  • Solid:Pattern
  • Leashes:Type
  • Mainland China:Origin
  • Anhui:CN
  • Dogs:Type
  • dog collar:dog accessories
  • collar perro:mascotas
  • dog harness:chien
  • accesorios para perros:dog leash
  • perros accesorios:correa perro
  • collier pour chien:arnes perro
  • harnais chien:dog accessory
  • szelki dla psa:collier chien
  • laisse pour chien:collar para perro

What’s in the box

1X 3M 5M Dog Leash Belt Longer Pet Leashes Walking Harness for Small Medium Large Dogs Ourdoor Training Long Lead Rope Correa Perro

Specifications

  • SKU: GE779LS2KSPY9NAFAMZ
  • Model: GBSgouqianyinsheng_5596
  • Production Country: China
  • Weight (kg): 0.2
  • Color: Pink
  • Main Material: PVC
  • Care Label: No direct sundlight, cleaning with low percentage alcohol
  • Shop Type: Jumia Mall

Verified Customer Feedback

This product has no ratings yet.

3M 5M Dog Leash Belt Longer Pet Leashes Walking Harness for Small Medium Large Dogs Ourdoor Training Long Lead Rope Correa Perro

3M 5M Dog Leash Belt Longer Pet Leashes Walking Harness for Small Medium Large Dogs Ourdoor Training Long Lead Rope Correa Perro

GH₵ 247.17
GH₵ 422.4041%
Questions about this product?

Recently Viewed

See All