Specifications:
Max. working temperature: 60C degree
Max. exposure temperature: 70C degree
Max. working length: 20M
Min. installation temperature: -40C degree
Voltage: 24V (Note:for 24V, do not beyond 20meters, redundant length will not heat up.)
Min. bend radius: @20C:25.4mm @-30C:35.0m
Cable Structure:
1. Copper-core wire: 7×0.42
2. Conductive heating elemen
3. HD polyolefin outer jacket
4. Metal braid explosion proof
Installation:
first unwind the heating cable. The cable must never be connected to the power line when it is wound up.
if the cable is too inflexible because of low temperatures, unwind it and put it for some minutes into the plug.
afterwards you can pass the cable.
the area around the pipe where you want to connect it with the cable must be accessibly and non-attached.
the heating cable can not be passed behind walls
put the thermostat (if need) with the round black contact area tightly on the coolest point of the pipe and fix it with insulating tape.
finally put the whole cable on the pipe and fasten it every 30~60cm with insulating tape.
attention: the cable must be fastening straight on the pipe
now you can check if your cable works.
afterwards insulate the water pipe and the heating cable with mineral rock wool or foam. Attention: never use more than 13mm of this material to insulate.
in general the heating cable must be protected against mechanical damage or biting.
the heating cable can not be put into liquids.
finally plug the cable into a 24V main plug
NOTE
DO NOT connect the two conductors together!