HomeElectronicsAccessories & SuppliesAudio & Video AccessoriesCables & InterconnectsAudio CablesDigital Coaxial Cables1pc Type-C Charger 1m 2m 3m Braided Fast Phone Charger Long Lead Usb Cables Charging Cable Usb Type C Cable Accessories
product_image_name-Generic-1pc Type-C Charger 1m 2m 3m Braided Fast Phone Charger Long Lead Usb Cables Charging Cable Usb Type C Cable Accessories-1

Share this product

Shipped from abroad

1pc Type-C Charger 1m 2m 3m Braided Fast Phone Charger Long Lead Usb Cables Charging Cable Usb Type C Cable Accessories

GH₵ 127.50 - GH₵ 170.00
GH₵ 171.70 - GH₵ 229.5026%

In stock

Order above GHC 150 on Jumia Express items & get free delivery | regular delivery from GH₵ 25.59 to Tema
0 out of 5
(No ratings available)
Variation available

Promotions

Delivery & Returns

Shipped from abroad 

Choose your location

Pickup Station

Delivery Fees GH₵ 25.59
Ready for pickup between 13 January and 16 January if you place your order within the next 18hrs 34mins

Door Delivery

Delivery Fees GH₵ 37.49
Ready for delivery between 13 January and 16 January if you place your order within the next 18hrs 34mins

Return Policy

Free return within 15 days for all eligible items.Details

Seller Information

CrossBorder Trend Store

60%Seller Score

Be the first to follow

Follow

Seller Performance

This seller does not have enough history for us to evaluate his performance yet

Product details

  • Welcome to our srore.
  • Type:Wrist Strap
  • Durable Material
  • Stylish Design
  • Versatile Usage
  • Great Value
  • Usb Type:Usb2.0 Type-c
  • Use:Smart Devices
  • Origin:Mainland
  • Certification:Ce
  • Product Size::1m/2m/3m
  • Available Colors::Black/red/blue/white
  • Product Material::Needle-through Knitting
  • Product Current::2.4a
  • Copper Wire Specific:55*0.08*2+10*0.08*2 Bare Copper Far Love Terminal
  • Usb Type:Usb2.0 Type-c
  • Use:Smart Devices
  • Origin:Mainland
  • Certification:Ce
  • Product Size::1m/2m/3m
  • Available Colors::Black/red/blue/white
  • Product Material::Needle-through Knitting
  • Product Current::2.4a
  • Copper Wire Specific:55*0.08*2+10*0.08*2 Bare Copper Far Love Terminal
image image image image image image

Specifications

Key Features

  • Welcome to our srore.
  • Type:Wrist Strap
  • Durable Material
  • Stylish Design
  • Versatile Usage
  • Great Value
  • Usb Type:Usb2.0 Type-c
  • Use:Smart Devices
  • Origin:Mainland
  • Certification:Ce
  • Product Size::1m/2m/3m
  • Available Colors::Black/red/blue/white
  • Product Material::Needle-through Knitting
  • Product Current::2.4a
  • Copper Wire Specific:55*0.08*2+10*0.08*2 Bare Copper Far Love Terminal

Specifications

  • SKU: GE779EA46OGXHNAFAMZ
  • Production Country: China
  • Weight (kg): 0.5
  • Warranty Type: Repair by Vendor

Verified Customer Feedback

This product has no ratings yet.

1pc Type-C Charger 1m 2m 3m Braided Fast Phone Charger Long Lead Usb Cables Charging Cable Usb Type C Cable Accessories

1pc Type-C Charger 1m 2m 3m Braided Fast Phone Charger Long Lead Usb Cables Charging Cable Usb Type C Cable Accessories

GH₵ 127.50 - GH₵ 170.00
GH₵ 171.70 - GH₵ 229.5026%
Questions about this product?

Recently Viewed

See All